Mist
61.2
As of: 6:26 am
>> for detailed weather

Events Calendar
News and Updates
No News Items
Conceptual Map

Please note that the concept map shown here is NOT the final design, but it is generally accurate.  While minor changes have been made, and a number of other features (stormwater, fire hydrants, etc.) will be installed with the project, the basic roadway and lane configurations are accurate.  For questions, please contact us at 614.382.5500 or PavingForProgress@Pickerington.net

Conceptual map